DbmLogoWebBeigeRGB
DBM Contractors, Inc.
item3
item3item3b1aitem3
item3Design/Builditem3Earth Retentionitem3Foundation Supportitem3Slope Stabilizationitem3b1aGround Improvementitem3Dewateringitem3
item3
item3
Design/BuildEarth RetentionFoundation SupportSlope StabilizationGround Improvement

Home

Safety

EEO/Careers

DBM Calendar

Contacts

DBM in the News

Projects

Testimonials

DBM ProjectsRuston Way

DBM Completes Sculpted Shotcrete Retaining Wall

on Tacoma Waterfront

Job Location: BNSF Ruston Way at M.P. 3.2, Tacoma, WA

Project Owner: City of Tacoma

Project Description: DBM Contactors Inc. recently completed a sculpted retaining wall between the railroad tracks and the Tacoma waterfront on Ruston Way. The 8000 square foot retaining wall required drilling 30” diameter shafts and installing 139 steel soldier piles. The reinforced shotcrete wall was sculpted and stained to resemble natural rock formations.

The work, completed safely, was done in close proximity to two live tracks with up to 40 freight and eight-passenger trains daily, running at speeds of up to 64 mph. Staging was done in the parking lots of the nearby waterfront restaurants and needed to accommodate significant pedestrian traffic along the scenic waterfront.

DBM’s subcontractors included Air Placed Concrete Specialists of Bothell, Wash., for the shotcrete facing and Turnstone of Seattle, for the architectural sculpting and painting. In 2002, DBM earned the “Utah’s Contractor of the Year” award for sculpting retaining walls in Provo Canyon.

Click on images to see a larger view

BoysAndGirlsClubLogoRGB

Thank you for supporting the Donald B. Murphy Memorial Golf Tournament.

We raised $47,000 in 2007 to bring our total up to $227,000.

Please support our
8th Annual Tournament
August 18, 2008.

Click here to register

Professional Affiliations:

adscforweb1
ADSCwestlogo
AmericanSubContractorsLogo
Quality Service for More Than

©2007 DBM Contractors, Inc. | All Rights Reserved | Site Design SaveAs Productions

leftbarasalogo4c
ASCELogo4c
Page12CGEALogo2
adsDFIlogo4color
GILogo4c
ismlogo2
 

Home

 

Mission Statement

 

Vision Statement

 

Safety Overview

 

Safety Practices at DBM

 

DBM Safety Record

 

DBM Safety Awards

 

EEO

 

Careers

 

Design Engineer

 

DBM Calendar

 

Corporate Information

 

Personnel Contact Information

 

DBM Completes Two Excavation Projects in Seattle

 

DBM Tackles Emergency Repairs

 

Tight urban excavation sites call for special techniques

 

Top-Down Shoring Wall for Colby Garage

 

DBM Hosts Micropile Installation School

 

Carnevale Takes Reins of ADSC’s Micropile Committee

 

DBM Completes Shoring for West 8th Project

 

Trio System in Seattle Makes Wall a Good Neighbor

 

Oceanside Landslide Repaired

 

DBM Awarded Quality Contractor of the Year

 

Solid Foundation

 

Soil Nail Shoring Completed for Condo Project

 

Walls and Shafts Completed for I-5 Project

 

Excavation Shoring Completed for Seattle Project

 

Oceanside Shotcrete Nail Wallt

 

Complex Shoring for Harborview Project

 

DBM Installs Excavation Support

 

Shoring Completed for Office Building

 

Shoring Completed at Overlake Hospital

 

ADSC Elects Tom Amour as Board VP

 

DBM Prepares Foundation

 

DBM Installs Shoring for Downtown Tunnel

 

Value Engineering Pays Off for ODOT

 

Waterfront Retaining Wall Completed

 

Low Tolerances, Steep Site Testing Lab Team in Berkeley

 

Scenic Canyon Work by DBM Tests Concrete’s Beauty

 

DBM Moves Bridge For Sound Transit

 

DBM Completes Shafts for Alaska’s Glenn Highway

 

DBM Completes Drilled Shaft Foundations

 

Robert A. Carnevale Joins DBM

 

DBM Completes Shoring on County Justice Center

 

Projects

 

The Cosmopolitan Condominium, Seattle, WA

 

Downtown Seattle Transit Tunnel

 

US 26:Sunset Highway, OR

 

Hood Canal Bridge Retrofit

 

BNSF Ruston Way

 

UC Santa Cruz Engineering Building

 

Caribou Creek, Palmer AK

 

Fred Hutchinson Cancer Research

 

SR 189 Provo Canyon, UT

 

SR 10 MSE, Soda Springs, ID

 

4360-08 St. Anthony's Medical Office

 

192-07 Banjo Bill Campground

 

179-07 8th St Bridge Replacement

 

4344-08 M Parsons Office Bldg

 

4343-08 Tri City Light Bases

 

4338-08 UPS Science Bldg

 

4337-08 Sehome Substation

 

190-07 112th Ave

 

186-07 Grays Harbor

 

184-07 8th & Virginia Downtown Seattle

 

4162-06/Small Projects Division

 

4145-06/Small Projects Division

 

4147-06/Small Projects Division

 

4127-06/Small Projects Division

 

139-06/Northeast Sawdust Hill/Kitsap County

 

4108-05/Small Projects Division

 

4049-05/Small Projects Division

 

4045-05/Small Projects Division

 

3997-05/Small Projects Division

 

980-04/C-510 Sound Transit Downtown Seattle

 

977-04/C-710 Sound Transit Beacon Hill

 

993-05/Neptune Apts