DbmLogoWebBeigeRGB
DBM Contractors, Inc.  DBM Contractors, Inc.  Donald B. Murphy Contractors, Inc.
item3
item3item3b1a1item3
item3Design/Builditem3Earth Retentionitem3Foundation Supportitem3Slope Stabilizationitem3b1a1Ground Improvementitem3Dewateringitem3
item3
item3
Design/BuildEarth RetentionFoundation SupportSlope StabilizationGround Improvement

Home

Safety

EEO/Careers

DBM Calendar

Contacts

DBM in the News

Projects

Testimonials

Earth Retention
BoysAndGirlsClubLogoRGB

Thank you for supporting the Donald B. Murphy Memorial Golf Tournament.

We raised $40,000 in 2009 to bring our total up to $324,500.

Please support our
10th Annual Tournament
August 16, 2010.

Click here to register

Professional Affiliations:

CalGeologocolorLG
adscforweb1
ISMLogo4cADSCwestlogo
adsDFIlogo4colorUCAWlogorgbOver 60 Years of Innovation

©2010 Donald B. Murphy Contractors, Inc. | All Rights Reserved | Site Design—SaveAs Productions

AmericanSubContractorsLogo
ASCELogo4c
AmericanShotCreteLogo4c
AGCAmericaLogo4cGILogo4c

Earth Retention

Click on the image to see a larger view

 

Cost-saving technologies providing lasting solutions

We give our clients the best value engineering by applying the latest technology and considering both constructability and cost. As a primary designer and builder of temporary and permanent earth retention systems, DBM is constantly applying new and advanced techniques as well as designing and manufacturing custom drilling equipment when conventional equipment use is impractical.

Earth Retention services and capabilities include:

• Soldier Pile and Lagging Systems

• Rock and Soil Tieback Anchors

• Soil Nailing

• Piling Systems

• Micropile Stabilization

• Structural and Architectural Shotcrete

• Slurry Diaphragm Walls

• Underpinning

• Soil Mixing

• Drainage Control Systems

• Secant Pile Walls and Rings

• Internally Braced Systems

Consistently providing ground reinforcement and strengthening

DBM is a recognized industry leader in developing and implementing soil nail and ground anchor technology.

Soil nailing is a cost effective method of providing earth retention structures for support of deep excavations, slopes, bridge abutments and roadways. Soil nails are primarily used to reinforce and strengthen the existing ground by installingclosely spaced steel bars secured by grouting. This technique creates a composite reinforced soil mass stable enough to retain the ground on a temporary or permanent basis.

Ground anchors differ from soil nails in that they are posttensioned structural elements, installed and pressure grouted in soil and rock to transmit an applied tensile load into the ground. Typical applications include anchored earth retention to stabilize excavations and slopes, resisting vertical uplift forces generated by hydrostatic, seismic and overturning forces. Commonly used in both temporary and permanent applications, ground anchors can provide significant cost savings over more conventional mass concrete structure alternatives.

DBM’s vast experience in design/build soil nailed and anchored earth structures has resulted in the successful construction of hundreds of specialty geotechnical projects including:

• Earth Retention

• Excavation Support

• Slope Stabilization

• Dam Anchorage

• Bridge/Equipment/Building Tiedowns

Over 60 Years of Innovation and Customer Satisfaction

©2010 Donald B. Murphy Contractors, Inc. | All Rights Reserved | Site Design—SaveAs Productions

DBM Contractors, Inc.  DBM Contractors, Inc.  Donald B. Murphy Contractors, Inc.Donald B. Murphy Contractors, Inc.
 

Home

 

Mission Statement

 

Vision Statement

 

Safety Overview

 

Safety Practices at DBM

 

DBM Safety Record

 

DBM Safety Awards

 

EEO

 

Careers

 

Senior Project Manager

 

Project Estimator

 

DBM Calendar

 

Corporate Information

 

Personnel Contact Information

 

Stone Columns Support Data Center

 

Big's the word in Nalley Valley Viaduct project

 

Soldier Piles Support Foundation at Highline

 

DBM Completes Two Excavation Projects in Seattle

 

Tight Urban Excavation Sites Call for Special Techniques

 

DBM Hosts Micropile Installation School

 

Carnevale Takes Reins of ADSC’s Micropile Committee

 

Trio System in Seattle Makes Wall a Good Neighbor

 

DBM Prepares Foundation

 

Low Tolerances, Steep Site Testing Lab Team in Berkeley

 

Scenic Canyon Work by DBM Tests Concrete’s Beauty

 

DBM Moves Bridge For Sound Transit

 

DBM Completes Shafts for Alaska’s Glenn Highway

 

DBM Completes Drilled Shaft Foundations

 

Robert A. Carnevale Joins DBM

 

DBM Completes Shoring on County Justice Center

 

Projects

 

The Cosmopolitan Condominium, Seattle, WA

 

Downtown Seattle Transit Tunnel

 

US 26:Sunset Highway, OR

 

Hood Canal Bridge Retrofit

 

BNSF Ruston Way

 

UC Santa Cruz Engineering Building

 

Caribou Creek, Palmer AK

 

Fred Hutchinson Cancer Research

 

SR 189 Provo Canyon, UT

 

SR 10 MSE, Soda Springs, ID

 

235-08 4S Ranch-Lone Bluff Slide Repair

 

233-08 OR-213 East Portland Freeway

 

236-08 St. Mark's Lutheran Church

 

229-08 Green River Bridge Emergency Repair

 

4360-08 St. Anthony's Medical Office

 

192-07 Banjo Bill Campground

 

179-07 8th St Bridge Replacement

 

4344-08 M Parsons Office Bldg

 

4343-08 Tri City Light Bases

 

4338-08 UPS Science Bldg

 

4337-08 Sehome Substation

 

190-07 112th Ave

 

186-07 Grays Harbor

 

184-07 8th & Virginia Downtown Seattle

 

4162-06/Small Projects Division

 

4145-06/Small Projects Division

 

4147-06/Small Projects Division

 

4127-06/Small Projects Division

 

139-06/Northeast Sawdust Hill/Kitsap County

 

4108-05/Small Projects Division

 

4049-05/Small Projects Division

 

4045-05/Small Projects Division

 

3997-05/Small Projects Division

 

980-04/C-510 Sound Transit Downtown Seattle

 

977-04/C-710 Sound Transit Beacon Hill

 

993-05/Neptune Apts